| Municipal |
Vendor: CenterPoint Pull: 6000 Amps @ 480 Volt 3-Phase over 2 Transformers Service level: Critical Customer - similar to Hospital Service level
|
Vendor: CenterPoint Pull: 6000 Amps @ 480 Volt 3-Phase over 2 Transformers Service level: Critical Customer - similar to Hospital Service level |
| Generators |
Generator 1 Power Plant: 16 Cylinder 3000 horse power Cummins Marine Grade Diesel Gen Set:ONAN Wattage: 1250 Kw Deployment: Load Sharing
Generator 2 Power Plant: 16 Cylinder 3000 horse power Cummins Marine Grade Diesel Gen Set: ONAN Wattage: 1500 Kw Deployment: Load Sharing
Generator 3 Power Plant: 16 Cylinder 3000 horse power Cummins Marine Grade Diesel Gen Set: ONAN Wattage: 2000 Kw Deployment: Load Sharing
All three Generators share the load at DC1 with the help of paralleling gear. When a service outage occurs all three generators will start for 10 minutes. If the total load is less then 60% of capacity of one generator, then the other generators will shutdown automatically. If the load reaches 80% of capacity of one generator the other generators will restart
The Power plants are tested weekly. The Generators are load tested monthly. The system is inspected quarterly.
|
Generator 1 Power Plant: 16 Cylinder 3000 horse power Cummins Marine Grade Diesel Gen Set:ONAN Wattage: 2000 Kw Deployment: Load Sharing
Generator 2 Power Plant: 16 Cylinder 3000 horse power Cummins Marine Grade Diesel Gen Set: ONAN Wattage: 2000 Kw Deployment: Load Sharing
Generator 3 Power Plant: 16 Cylinder 3000 horse power Cummins Marine Grade Diesel Gen Set: ONAN Wattage: 2000 Kw Deployment: Load Sharing
All three Generators share the load at DC2 with the help of paralleling gear. When a service outage occurs all three generators will start for 10 minutes. If the total load is less then 60% of capacity of one generator, then the other generators will shutdown automatically. If the load reaches 80% of capacity of one generator the other generators will restart
The Power plants are tested weekly. The Generators are load tested monthly. The system is inspected quarterly.
|
| Power Switching |
In the event of a service outage from CenterPoint, the generators will turn over and power will be switched automatically in seconds. This system is tested every month. |
In the event of a service outage from CenterPoint, the generators will turn over and power will be switched automatically in seconds. This system is tested every month. |
| UPS |
Currently there are 5 375 Kw Mitsubishi |
Currently there are 4-375 and 4-500 KVA Mitsubishi |
| Cooling Units |
AC Units: Data Aire 30 Ton Number of Units: 30 Total tonnage: 900 Tons
|
AC Units: Liebert 30 Ton Number of Units: 34 Total tonnage: 1020 Tons
|